Today's Inspections

 
PERMITADDRESSINSPECTIONINSPECTORTIMERESULTCOMPLETED
Data pager
Data pager
Page size:
PageSizeComboBox
select
 72 items in 4 pages
278 LEAFY ASTER LND:FINAL DESCJASON INGENTHRONTBDAPPROVED04/27/2026 
5050 FACTORY SHOPS BLVD 645B:ELECTRICAL SERVICEJON WHITEAMCANCEL04/27/2026AM
3950 BUTTERFIELD CROSSING DRB:ELECTRICAL SERVICEVINCE RAPONEAM  AM
5050 FACTORY SHOPS BLVD 100B:FNL MECHVINCE RAPONEAM  AM
5050 FACTORY SHOPS BLVD 100B:FNL ELECTRICVINCE RAPONEAM  AM
5050 FACTORY SHOPS BLVD 175B:FNL ELECTRICVINCE RAPONEAM  AM
1460 INTERSTATE 25 FRONTAGEB:CAISSONSVINCE RAPONEAMPARTIAL04/27/2026AM
62 FOUNDERS PKWY FB:RGH ELECTVINCE RAPONEPM  PM
510 TIPPEN PLR:FINAL BUILDINGVINCE RAPONEAM  AM
5050 FACTORY SHOPS BLVD 750B:FNL ELECTRICVINCE RAPONEAM  AM
5050 FACTORY SHOPS BLVD 750B:FNL MECHVINCE RAPONEAM  AM
2004 PEACHLEAF LOOPTRAC:ELEC CONSTR METERVINCE RAPONEAM  AM
3555 PRIMROSE LNR:FINAL WATER HTR**VINCE RAPONEAMAPPROVED04/27/2026AM
610 JERRY STB:FNL MECHBRETT LONGNECKERAM  AM
5050 FACTORY SHOPS BLVD 175B:FNL MECHBRETT LONGNECKERAM  AM
5050 FACTORY SHOPS BLVD 175B:FINAL BUILDINGBRETT LONGNECKERAM  AM
6360 PROMENADE PKWY 130REQUEST PRE CON MEETINGBRETT LONGNECKERAM  AM
5095 COAL BANK DRTRAC:INSULATIONSHAWN VALENZUELAAMAPPROVED04/27/2026AM
430 LEAFY ASTER LNTRAC:PORCH POST REARSHAWN VALENZUELATBDAPPROVED04/27/2026 
430 LEAFY ASTER LNTRAC:INSULATIONSHAWN VALENZUELATBDAPPROVED04/27/2026 
 

Inspection requests for AM/PM are not guaranteed.  Every effort is made to ensure your request of AM/PM is fulfilled, however high demand can result in your requested time not being met.

*PLEASE ENSURE THERE IS A DATE POPULATED WHEN SCHEDULING YOUR INSPECTION!