| 07/27/2026 | L:PRE CON | WILLIAM BROWN | APPROVED | | 7/23/2026 1:48:01 PM
Chris w/ Hines and Jared w/Greater Ground
7/27/2026 3:19:33 PM
met onsite. discussed stage 2 drought restrictions, may postpone planting until end of Sep. discussed procedure for POC and Soils Inspections.
|
|
| U:IRR METER SET | GRANT TAYLOR | | VOIDED (KRHA 8/11/2026) | 8/11/2026 1:12:40 PM
Inspection voided by KRHA.
|
|
| 08/13/2026 | L: BACKFLOW SURVEY INSPECTION | ERIN SWEENEY | APPROVED | See comments. | 8/14/2026 7:19:52 AM
Passing irrigation backflow test required.
|
|
| 08/27/2026 | L:SOIL TILL | WILLIAM BROWN | APPROVED | | |
|
| 08/27/2026 | L:POINT OF CONNEC | WILLIAM BROWN | APPROVED | | |
|
| 08/27/2026 | L:SOIL COMPOST | WILLIAM BROWN | APPROVED | | |
|
| 09/15/2026 | U:IRR METER SET | GRANT TAYLOR | METER INSP FAIL 1 | | 9/15/2026 11:22:44 AM
Water needs to be charged up to the 2nd Backflow shut off.
|
|
| 09/22/2026 | U:IRR METER SET | GRANT TAYLOR | APPROVED | | |
|
| 10/20/2026 | L:LANDSCAPE FINAL | WILLIAM BROWN | APPROVED | | |
|
| 10/23/2026 | L:IRRIGATION FINAL | WILLIAM BROWN | APPROVED | | |
|