Permit No. IRR25-0009 Permit Type   IRRIGATION Site Address   5050 FACTORY SHOPS BOULEVARD 930
CASTLE ROCK, CO 80108
Applied   08/14/2025 Applicant   CRAIG REALTY GROUP CASTLE ROCK
Approved   08/22/2025 Owner   CRAIG REALTY GROUP CASTLE ROCK
Issued   08/22/2025 Contractor  
Parent Permit No.   Description   Outlets Pad B1 Existing POC acct 4588
  Notes  
 
  Date of Inspection Inspection Type Inspector Result Remarks Notes

 09/15/2025L:PRE CONWILLIAM BROWNAPPROVEDsee notes9/22/2025 10:59:18 AM approved IRR plans with pre-con notes uploaded as attachment

 10/01/2025L:SOIL COMPOSTWILLIAM BROWNNOT APPROVED10/1/2025 3:26:23 PM RLP not site, nor anyone else from RC Custom Landscape. inspected 4 parking lot island areas and the south and west perimeter of retaining wall. Adequate compost in all areas except the northern 1/3 of the island with existing light pole.

 10/07/2025L:RE-SOIL COMPOSTWILLIAM BROWNPARTIAL10/7/2025 1:50:02 PM previous punch list items completed. re-inspection passed for highlighted sections as noted in attached photograph

 10/09/2025L:SOIL TILLWILLIAM BROWNPARTIAL10/9/2025 2:14:44 PM met onsite Ray and Yesenia. Completed sections passed, refer to attachment: October 2025 inspected sections.JPG

 03/18/2026L:SITE VISITWILLIAM BROWNDAILY OBSERVE DONEoffice@rccustomlandscapes.com3/18/2026 1:12:47 PM landscape set, awaiting spring planting. unknown status on irrigation system. snow storage photos impact on new landscape.

 06/18/2026L:SOIL COMPOSTWILLIAM BROWNAPPROVED6/18/2026 3:51:25 PM 3 pkg lot islands to north + north entrance bed

 07/07/2026L:SOIL COMPOSTWILLIAM BROWNAPPROVED7/9/2026 2:49:42 PM retaining wall, streetscape beds along Factory Shops

 07/08/2026L:SOIL TILLWILLIAM BROWNAPPROVED7/9/2026 2:48:59 PM along retaining wall and beds along Factory Shops

 11/03/2026L:POINT OF CONNECWILLIAM BROWNAPPROVED11/3/2026 3:29:42 PM inside sprinkler room

 11/03/2026L:LANDSCAPE FINALWILLIAM BROWNAPPROVED

 11/03/2026L:IRRIGATION FINALWILLIAM BROWNNOT APPROVED11/3/2026 3:32:59 PM grounding rods required per manufacturers spec on 2 wire; op indicators required in all drip zones

 11/06/2026L:RE_IRRIGATION FINALWILLIAM BROWNAPPROVEDPad B111/6/2026 2:00:07 PM punchlist complete 11/18/2026 9:02:46 AM w/ IRR25-0002