| 12/11/2023 | L:POINT OF CONNEC | TIM DAGG | APPROVED | | 12/11/2023 10:48:13 AM
QC fitting is a 1.5 x 1.5 x 1 inch service T on a 1 inch line
3/5/2024 4:10:53 PM
Service T was changed out on 12/11 and inspected on 12/12 and approved.
|
|
| 03/18/2024 | U:IRR METER SET | RYAN CUPANO | NOT APPROVED | | 3/18/2024 4:46:43 PM
Inspection failed for:
-no access to road (unable to drive on road due to inaccessible conditions)
-cs, stop & waste, and pit need to be visible and accessible
|
|
| 03/27/2024 | L:SOIL COMPOST | TIM DAGG | APPROVED | | 3/27/2024 11:04:06 AM
Areas along coal bank drive, burnell rd, Montaigne circle entrances.
|
|
| 04/05/2024 | L:SOIL TILL | TIM DAGG | APPROVED | | |
|
| 04/26/2024 | U:IRR METER SET | JOSH BURD | APPROVED | | |
|
| 10/19/2026 | L:SITE VISIT | WILLIAM BROWN | DAILY OBSERVE DONE | | 10/19/2026 2:32:06 PM
met with Chris Landwise onsite, awaiting as-builts and scheduling IRR/LND final
|
|
| 10/28/2026 | L:IRRIGATION FINAL | WILLIAM BROWN | NOT APPROVED | | 10/28/2026 3:14:39 PM
op-ind/ FV
lid engraving
Zone 4/5 nozzles
Zone 12 QC, possible leak near valve box
tree zones 11,14,16 check operability
|
|
| 11/10/2026 | L:LANDSCAPE FINAL | WILLIAM BROWN | APPROVED | | |
|
| 11/10/2026 | L:RE-SF LANDSCAPE IRR FINAL | WILLIAM BROWN | APPROVED | | 11/10/2026 12:20:56 PM
28 OCT 26 punchlist complete
|
|
| 11/18/2026 | L:SDF LNDSCP SURETY REV | DIANE MAKI | CANCEL | | |
|