| R:UNGRD PLUMB | COLBY RIGGINS | | Moved ungrd piping for bathroom | 7/9/2026 12:41:12 PM
7/9/2026 12:41 PM Taylor Koon
Contact Name: Taylor Koon
Site Address: 1932 PERALTA LOOP
Phone: 5209557961
e-Mail: tk4218@gmail.com
|
|
| 07/13/2026 | R:UNGRD PLUMB | COLBY RIGGINS | APPROVED | moved ungrnd plumbing basement bathroom | 7/9/2026 5:19:50 PM
7/9/2026 5:19 PM Taylor Koon
Contact Name: Taylor Koon
Site Address: 1932 PERALTA LOOP
Phone: 5209557961
e-Mail: tk4218@gmail.com
7/13/2026 2:41:14 PM
Approved
|
|
| 08/21/2026 | R:ROUGH FRAME | SHAWN VALENZUELA | NOT APPROVED | eTRAKiT Inspection Request | 8/19/2026 6:47:04 PM
8/19/2026 6:47 PM Taylor Koon
Contact Name: Taylor Koon
Site Address: 1932 PERALTA LOOP
Phone: 5209557961
e-Mail: tk4218@gmail.com
8/21/2026 11:56:00 AM
Rough frame inspection, not approved
1. Missing fire blocking in soffits
2. Missing bushings in light fixtures boxes
3. Demo all existing lighting not being used
4. Fan rated boxes need to be installed in bedrooms/ office
5. Bathroom Exhaust fan power incomplete
Recall in rough frame inspection when ready
Note
Current basement window well does not meet 9 ft.b2 requirement to be considered an egress window
8/21/2026 11:58:46 AM
Rough frame inspection, not approved
1. Demo all existing lighting, not being used.
2. Bathroom exhaust fan in complete electrical needs to be landed in exhaust fan
3. Please add plastic bushings to all lighting junction boxes, and ceiling.
4. Missing fire, blocking and soffit.
5. Electrical lighting boxes in bedroom and office required to be fan rated boxes.
Recall rough frame inspection when corrections are completed
Notes
Current egress window well does not meet the 9 ft.b2 requirement to be considered an egress window
|
|
| 08/24/2026 | R:ROUGH FRAME | VINCE RAPONE | APPROVED | eTRAKiT Inspection Request | 8/21/2026 1:56:47 PM
8/21/2026 1:56 PM Taylor Koon
Contact Name: Taylor Koon
Site Address: 1932 PERALTA LOOP
Phone: 5209557961
e-Mail: tk4218@gmail.com
8/24/2026 11:04:24 AM
Rough frame approved
Insulation approved
Schedule final building and final electrical when ready
Note -
revise print to show office instead of bedroom before final inspection
Emergency egress window in living room will need a ladder at final inspection
|
|
| 11/02/2026 | R:FINAL BUILDING BASEMENT** | SHAWN VALENZUELA | APPROVED | eTRAKiT Inspection Request | 10/30/2026 4:06:23 PM
10/30/2026 4:06 PM Taylor Koon
Contact Name: Taylor Koon
Site Address: 1932 PERALTA LOOP
Phone: 5209557961
e-Mail: tk4218@gmail.com
11/2/2026 10:45:20 AM
Final building basement inspection approved
Electrical, plumbing, mechanical approved
Notes
Seal shower head ring
|
|