| 06/09/2026 | B:RGH FRAME | JOE CARBAUGH | NOT APPROVED | eTRAKiT Inspection Request | 6/8/2026 3:34:39 PM
6/8/2026 3:34 PM LAKOTA ROOFING AND CONSTRUCTION INC
Framing inspection. On lockbox 1475. Please let us know rough time so we can try to be onsite during inspection
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
6/9/2026 2:23:08 PM
NOT APPROVED-
1) COMPLETE ALL RGH MEP's BEFORE RGH FRAME.
2) FRAMING PLANS DO NOT MATCH AS BUILT CONDITIONS/ UPDATED PLANS WITH PLAN REVIEW & FRONT COUNTER OR PROVIDE A STAMPED LETTER FROM A COLORADO DESIGN PROFESSIONAL OF AS BUILT CONDITION.
NOTE: RECALL RGH FRAME WHEN ALL ITEMS HAVE BEEN COMPLETED.
|
|
| 07/02/2026 | B:RGH ELECT | SHAWN VALENZUELA | NOT APPROVED | eTRAKiT Inspection Request | 7/1/2026 7:55:41 PM
7/1/2026 7:55 PM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
7/2/2026 12:09:27 PM
Rough electrical inspection not approved
1. Please have stamped approved town match existing one line diagram on site
2. One line diagram with print provided on site do not match what is currently installed. Subpanel was added on second floor does not show on prints. Please revise and resubmit plans to the town of Castle rock once prints are uploaded. Please contact front building counter so print can be reviewed.
|
|
| 07/31/2026 | B:RGH ELECT | SHAWN VALENZUELA | PARTIAL | eTRAKiT Inspection Request | 7/31/2026 10:25:24 AM
7/31/2026 10:25 AM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
7/31/2026 2:53:58 PM
Rough electrical partial inspection approved
Notes
First floor walls and ceiling ok
Second floors walls only
Will verify at final inspection frog eye at bottom of stairs land is surface mount and installed.
Call 2nd floor rough ceiling inspection when drop ceiling is installed
|
|
| 07/31/2026 | B:RGH MECH | JOE CARBAUGH | APPROVED | eTRAKiT Inspection Request | 7/31/2026 10:25:24 AM
7/31/2026 10:25 AM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
7/31/2026 2:54:16 PM
APPROVED-
1) DUCT LAYOUT, SEAL & SUPPORT-OK.
|
|
| 07/31/2026 | B:RGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 7/31/2026 10:25:24 AM
7/31/2026 10:25 AM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
7/31/2026 2:54:19 PM
PARTIAL-
1) UPDATE HEADER SCHEDULE ON PLAN TO MATCH AS BUILT CONDITION.
2) REST OF RGH FRAME - OK.
3) COMPLETE RGH ELECTRICAL.
NOTE: RECALL RGH FRAME INSPECTION WHEN FIRE-BLOCKING FOR DUCTING IS COMPLETE.
|
|
| 08/03/2026 | B:RGH FRAME | BRETT LONGNECKER | PARTIAL | eTRAKiT Inspection Request | 8/2/2026 8:38:38 AM
8/2/2026 8:38 AM LAKOTA ROOFING AND CONSTRUCTION INC
fire blocking in soffits
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
8/3/2026 4:19:17 PM
Rough frame and rough mechanical for 1st floor walls and ceiling ok.
Rough frame for 2nd floor walls only.
Reschedule rough electrical and rough frame for ceiling on 2nd floor.
|
|
| 08/07/2026 | B:DRYWALL | BRETT LONGNECKER | APPROVED | eTRAKiT Inspection Request | 8/6/2026 8:29:36 AM
8/6/2026 8:29 AM LAKOTA ROOFING AND CONSTRUCTION INC
drywall screw inspection
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
8/7/2026 8:37:15 AM
Drywall wall approved.
Note:
Inspection card not on site.
|
|
| 08/13/2026 | B:RGH ELECT | SHAWN VALENZUELA | NOT APPROVED | eTRAKiT Inspection Request | 8/12/2026 1:09:26 PM
8/12/2026 1:09 PM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
8/13/2026 10:43:18 AM
Rough electrical inspection not approved
2nd floor drop ceiling inspection
1. Ceiling tiles have already been installed
2. Can lights in ceiling need to be independently supported
3. Open j boxes need to be labeled and closed
Reschedule inspection when corrections are completed
|
|
| 08/14/2026 | B:RGH ELECT | SHAWN VALENZUELA | NOT APPROVED | eTRAKiT Inspection Request | 8/13/2026 1:03:33 PM
8/13/2026 1:03 PM LAKOTA ROOFING AND CONSTRUCTION INC
Grid upstairs
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
8/14/2026 11:06:12 AM
Rough electrical inspection not approved
1. Can lights installed in 2nd floor drop ceiling need to be independently supported to building or structure minimum of #12 gauge ceiling wire.
Recall inspection when corrections are completed
Notes
Final electrical inspection
Verify main disconnect on exterior of building
Verify sub panel final electrical connections on 2nd floor
Verify 1st main panel final electrical connections
Verify all em/ exits signs
Verify all new mechanical equipment being installed 2nd floor mechanical closet / mini split located outside of front door
|
|
| 08/14/2026 | B:RGH FRAME | JOE CARBAUGH | NOT APPROVED | eTRAKiT Inspection Request | 8/13/2026 1:03:33 PM
8/13/2026 1:03 PM LAKOTA ROOFING AND CONSTRUCTION INC
Grid upstairs
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
8/14/2026 12:51:29 PM
NOT APPROVED-
1) COMPLETE RGH ELECTRICAL.
2) IN CORRECT SIZE OF GRID WIRE/ 12 GAGE REQUIRED.
NOTE: RECALL INSPECTION WHEN ALL ITEMS HAVE BEEN COMPLETED.
|
|
| 11/16/2026 | B:RE ROUGH ELECTRICAL | SHAWN VALENZUELA | APPROVED | | 11/16/2026 10:42:38 AM
Re rough electrical inspection approved
All corrections have been completed
|
|
| 11/16/2026 | B:RGH FRAME | JOE CARBAUGH | APPROVED | eTRAKiT Inspection Request | 11/13/2026 1:41:32 PM
11/13/2026 1:41 PM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
11/16/2026 1:51:16 PM
APPROVED.
|
|
| 11/16/2026 | B:FNL ELECTRIC | SHAWN VALENZUELA | NOT APPROVED | eTRAKiT Inspection Request | 11/13/2026 12:12:05 PM
11/13/2026 12:12 PM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
11/17/2026 7:35:59 AM
2nd floor sub panel minimum 36in clearance in front of panel
2nd floor sub panel missing all labels, and dead front cover. AIC rating, arch flash, voltage, panel schedule, place of origin label all em circuits
Open junction box next to 2nd floor sub panel
Missing spark rings on 2nd floor wood deactivate walls
Verify at next inspection all em are on with local lighting circuit
1st floor corrections
Plans show remote head at front exterior door
All receptacles in warehouse require GFCI protection per plans both on east office walls 3 locations
1st floor main panel missing dead front cover, all labels AIC rating, arch flash, voltage, panel schedule, place of origin label all em circuits close all junction boxes next to panel
Verify at next inspection all em lights are on local lighting circuit 1st floor
Exterior new ac requires gfci protection
Label ac disconnect
Label main exterior disconnect
updated notes by inspector on 11/17/2026
Per plans shows remote heads at 2 locations. 1 is above main exterior door. 2 is above warehouse emergency exit door. both lights need to be provided with emergency battery backup, turn on when loss of power is simulated.
|
|
| 11/16/2026 | B:FNL MECH | JOE CARBAUGH | NOT APPROVED | eTRAKiT Inspection Request | 11/13/2026 12:12:05 PM
11/13/2026 12:12 PM LAKOTA ROOFING AND CONSTRUCTION INC
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
11/20/2026 1:58:43 PM
NOT APPROVED-
1) MISSING HORIZONTAL GAS LINE SUPPORT / INSIDE OF EXTERIOR WALL.
2) MISSING THREE POINT CONNECTIONS AT EXHAUST JOINTS.
Notes:
- MISSING UNSCREWED CAPS FOR A/C UNIT.
- A/C CURRENTLY HAS NO PERMIT / NEW INSTALL OF A/C UNIT REQUIRES A PERMIT.
REST OF MECHANICAL FINAL- OK.
|
|
| 11/20/2026 | B:FINAL BUILDING | JON WHITE | INC OK FOR TCO | SEE NOTES | 11/19/2026 2:40:25 PM
11/19/2026 2:40 PM LAKOTA ROOFING AND CONSTRUCTION INC
Fire department will inspect at 10am
Contact Name: LAKOTA ROOFING AND CONSTRUCTION INC
Site Address: 504 SECOND ST
Phone: 8552324797
e-Mail: STACIA@SMLAKOTA.COM
11/20/2026 2:12:44 PM
FINAL BUILDING INSPECTION INCOMPLETE; OK FOR TCO
SWO HAS BEEN APPROVE TO BE REMOVED AND OCCUPANCY CAN NOW BE ALLOWED PER THE TOWN OF CASTLE ROCK'S BUILDING DIVISION AND CRFD FIRE ANDLIFE SAFETY DIVISION
THE FOLLOWING ARE CORRECTIONS TO BE MADE PRIOR TO CO ISSUANCE;
1- COMPLETE FINAL ELECTRICAL AND MECHANICAL INSPECTIONS
2- COMPLETE FINAL FIRE INSPECTION
3- MISSING TYPE X3 EMERGENCY LUMINAIRES AT SOUTH EXIT AND FRONT ENTRY PER PLAN (E2.0)
4- MAKE CLEAR EGRESS AT SOUTH EGRESS DOOR IN WAREHOUSE. MINIMUM 36" CLEAR PATH
5- SCHEDULERE-FINAL BUILDING INSPECTION
NOTES;
- PLEASE SEE ELECTRICAL AND MECHANICAL CORRECTIONS BELOW THAT NEED TO BE CORRECTED PRIOR TO SCHEDULING FINAL INSPECTIONS;
ELECTRICAL
1- Open junction box next to 2nd floor sub panel
2- Missing spark rings on 2nd floor wood deactivate walls
1st floor corrections
1- Plans show remote head at front exterior door
2- All receptacles in warehouse require GFCI protection per plans both on east office walls 3 locations
3- 1st floor main panel missing dead front cover, all labels AIC rating, arch flash, voltage, panel schedule, place of origin label all em circuits close all junction boxes next to panel
4- Label main exterior disconnect
updated notes by inspector on 11/17/2026
5- Per plans shows remote heads at 2 locations. 1 is above main exterior door. 2 is above warehouse emergency exit door. both lights need to be provided with emergency battery backup, turn on when loss of power is simulated.
MECHANICAL
1) MISSING HORIZONTAL GAS LINE SUPPORT / INSIDE OF EXTERIOR WALL.
2) MISSING THREE POINT CONNECTIONS AT EXHAUST JOINTS.
Notes:
- MISSING UNSCREWED CAPS FOR A/C UNIT.
- A/C CURRENTLY HAS NO PERMIT / NEW INSTALL OF A/C UNIT REQUIRES A PERMIT.
REST OF MECHANICAL FINAL- OK.
11/20/2026 1:58:43 PM
|
|