| 10/01/2026 | B:ELECTRICAL UNDERGR | SHAWN VALENZUELA | PARTIAL | eTRAKiT Inspection Request | 9/29/2026 12:02:09 PM
9/29/2026 12:02 PM CARLTON ELECTRIC INC
We are needing a partial underground for the kiosk. Jason Olin is your contact, 303-335-8152.
Contact Name: CARLTON ELECTRIC INC
Site Address: 400 COSTCO LN
Phone: 7208434722
e-Mail: carlylytle@CARLTONELECTRIC.COM
10/1/2026 3:01:24 PM
Electrical underground inspection partial approved
All ridged metal conduit to be located inside of Kiosk 3/4 1in 2in 3in
1 5/8 ground rod
Branch circuit conduits feeding fuel pumps low voltage feeding pumps
Branch circuits feeding tanks low voltage feeding tanks
Branch circuits feeding canopy
Low voltage to tie into existing conduits going to cost co building
2 3in conduits to stub to manual transfer switch
All conduit 15 feet underground stub from kiosk to be extended in future
(See photo)
No conduits installed for electrical service at this time
|
|
| 10/01/2026 | PRE CON INSPECTION | BRETT LONGNECKER | IN PROGRESS | eTRAKiT Inspection Request | 9/30/2026 8:01:14 AM
9/30/2026 8:01 AM JONES COVEY GROUP, INC.
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 6617172412
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
10/1/2026 3:58:56 PM
Scheduled for 10:00 am Tuesday, October 5th.
|
|
| 10/09/2026 | B:UFER | SHAWN VALENZUELA | APPROVED | Check Ufer at the kiosk | 10/8/2026 11:16:41 AM
10/8/2026 11:16 AM JONES COVEY GROUP, INC.
Jose Gurrola 661-717-2412
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 8889727581
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
10/9/2026 10:16:02 AM
Ufer inspection approved
1/0 bare copper attached to #4 rebar 20 feet in length. 1/0 bare copper to sub into electrical room.
|
|
| 10/12/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | Water & Sewer | 10/8/2026 11:59:09 AM
10/8/2026 11:59 AM JONES COVEY GROUP, INC.
Jose Gurrola 661-717-2412
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 8889727581
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
10/12/2026 11:29:42 AM
DWV approved, water line into the unit was not on test. there is a connection cuopling underground outside the unit. Please put on test.
|
|
| 10/21/2026 | B:ROUGH PLUMBING | MARTIN MAGERS | APPROVED | check for water connection | 10/20/2026 12:08:19 PM
10/20/2026 12:08 PM JONES COVEY GROUP, INC.
water connection. ready for inspection.
Jose Gurrola 661-717-2412
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 6617172412
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
10/21/2026 12:53:32 PM
Corrections made. Water line on test.
|
|
| 10/27/2026 | B:ROUGH PLUMBING | MARTIN MAGERS | PARTIAL | Jose Gurrola 661-717-2412 | 10/26/2026 10:58:17 AM
10/26/2026 10:58 AM JONES COVEY GROUP, INC.
water and the venting in the wall
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 6617172412
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
10/27/2026 10:27:44 AM
DWV and Wter lines approved. Still need insulation and heat line.
|
|
| 10/29/2026 | B:RE ROUGH PLUMBING | BRETT LONGNECKER | APPROVED | wall insulation and electrical wire. | 10/28/2026 4:22:43 PM
10/28/2026 4:22 PM JONES COVEY GROUP, INC.
wall insulation and electrical wire. wire warmer
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 6617172412
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
10/29/2026 10:36:00 AM
All rough plumbing and underground complete.
|
|
| 11/10/2026 | B:ELECTRICAL UNDERGR | SHAWN VALENZUELA | PARTIAL | check part of the underground electrical | 11/9/2026 5:15:53 PM
11/9/2026 5:15 PM JONES COVEY GROUP, INC.
underground electrical. Check under the canopy to tank hole area.
661-717-2412
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 6617172412
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
11/10/2026 2:37:10 PM
Electrical underground inspection partial approved
Notes
1in conduit x3 at each pump power data veeder root coming from kiosk
Camera grey box located outside of kiosk each kiosk column gets conduits and spares and data
Warming hut conduits going to kiosk x4
All conduits are 1in
Ok to back fill canopy area up to transition sumps. As long as all other mbp are approved
Conduits past transition sumps to fuel tanks have not been inspected at this time
|
|
| 11/13/2026 | B:ELECTRICAL UNDERGR | SHAWN VALENZUELA | PARTIAL | under ground electrical at the tank hole | 11/12/2026 3:15:04 PM
11/12/2026 3:15 PM JONES COVEY GROUP, INC.
check the underground electrical at tank hole and kiosk service line.
Contact Name: JONES COVEY GROUP, INC.
Site Address: 400 COSTCO LN
Phone: 6617172412
e-Mail: ELLEN.COLLINS@JFPETROGROUP.COM
11/13/2026 10:17:30 AM
Electrical underground inspection partial approved
Notes
2 3in conduits coming from core transformer to ct cabinet. Recall inspection when conduits are stub to exact transformer location
2 3inch conduit coming from disconnect to manual transfer switch 2 3 inch conduits going for manual transfer switched to inside of building previously inspected
Verify bonding #4 fill sumps ground native soil fill sumps #4 cad-welded to ground rod
All conduits 1in pvc/ ridged
Approved from transition sumps to fill sumps
|
|