| 12/15/2025 | B:UNGRD PLUMB | BRETT LONGNECKER | NOT APPROVED | eTRAKiT Inspection Request | 12/10/2025 3:26:11 PM
12/10/2025 3:26 PM UMC INC
Sand/Oil Tank
Contact Name: UMC INC
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
12/15/2025 8:10:32 AM
Nate 7204034162
12/15/2025 9:15:18 AM
Consult for inspection sequence of sand/oil waste interceptor.
Schedule inspection with PCWRA for inspection of interceptor.
Schedule Town for inspection of all plumbing to interceptor.
|
|
| 12/18/2025 | B:UNGRD PLUMB | BRETT LONGNECKER | PARTIAL | sand oil waste interceptor cleanouts. | 12/17/2025 11:06:32 AM
UNDERGROUND SAND OIL TANK NATHAN 7204034162
12/18/2025 6:33:24 AM
Clean outs and piping into sand/ oil waste interceptor ok. Piping stubs out 8 ft from interceptor. Still need to inspect remain sand/oil waste piping throughout all parking areas.
|
|
| 01/14/2026 | B:ELECTRICAL SERVICE | VINCE RAPONE | PARTIAL | eTRAKiT Inspection Request | 1/13/2026 8:40:27 AM
1/13/2026 8:40 AM Clyde George
UFER inspection.
Contact Name: Clyde George
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
1/14/2026 2:44:26 PM
Ufer stubbed into electrical room good
|
|
| 01/16/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | eTRAKiT Inspection Request | 1/15/2026 1:59:19 PM
1/15/2026 1:59 PM UMC INC
grease interceptor in/out connections
Contact Name: UMC INC
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
1/16/2026 12:55:37 PM
Grease pit with stub outs approved.
|
|
| 02/05/2026 | B:UNGRD PLUMB | BRETT LONGNECKER | NOT APPROVED | Courtesy Inspection | 2/4/2026 1:46:37 PM
2/4/2026 1:46 PM UMC INC
Courtesy insp- questions about sanitary and storm tie in outside building
Contact Name: UMC INC
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
2/5/2026 12:20:22 PM
Courtesy inspection to discuss south side of building lower parking sanitary and storm drain connections outside of building. Ok to use 6 inch cleanouts for sanitary outside of building as long as civics do not call for 8 inch.
Storm drain cleanouts inside building footing print can be used for clean out outside of building as long as any radiuses greater than 45 degrees are within 40 ft of that clean out.
|
|
| 02/09/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | south P1 san sewer | 2/6/2026 12:45:59 PM
2/6/2026 12:45 PM UMC INC
Contact Name: UMC INC
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
2/6/2026 1:04:07 PM
2/6/2026 1:04 PM UMC INC
Contact Name: UMC INC
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
2/9/2026 11:10:24 AM
DWV for south end approved.
Note: 2 areas were moved significantly, please revise to match red lines.
|
|
| 02/17/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | eTRAKiT Inspection Request | 2/13/2026 4:05:30 PM
2/13/2026 4:05 PM UMC INC
underground storm area a
Contact Name: UMC INC
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
2/17/2026 12:25:52 PM
P1 area A storm drain marked in orange.
|
|
| 02/18/2026 | B:UNGRD PLUMB | MARTIN MAGERS | CANCEL | NATE 7204034162 | 2/17/2026 3:46:45 PM
CALLED AFTER 4PM ON FRIDAY. LEFT MESSAGE FOR TUESDAY.
2/18/2026 12:34:50 PM
Scheduled for wrong day
|
|
| 02/19/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | Southwest area A storm | 2/18/2026 2:10:29 PM
2/18/2026 2:10 PM UMC INC
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
2/19/2026 11:49:03 AM
Ground plumbing for storm drain West portion of Sector A approved. See picture of P101 outlined in orange.
|
|
| 02/20/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | east area a sand oil piping | 2/19/2026 2:27:00 PM
2/19/2026 2:27 PM UMC INC
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
2/20/2026 2:07:05 PM
Sand and oil drain lines south of 1.7. Marked in blue on P101. Note sand trap not yet installed.
|
|
| 02/25/2026 | B:RGH MECH | JOE CARBAUGH | NOT APPROVED | Courtesy Inspection for Slap Penetration | 2/19/2026 6:59:08 AM
2/19/2026 6:59 AM STEELE BROS HEATING INC
Contact Name: Pablo Hernandez
Site Address: 444 FIFER ST
Phone: 3039446370
e-Mail: pablo@steelebros.net
2/25/2026 11:21:33 AM
RGH MECH - NOT APPROVED.
NOTE: MEETING WAS WITH LEAD SUPERINTENDENT CLYDE GEORGE & HIS CREW. THE FOLLOWING WAS DISCUSSED -
TALKS ABOUT MEP PENETRATIONS , RATED ASSEMBLIES, INSPECTION PROCESS & PHASE INSPECTIONS. QUESTIONS ABOUT SUBMITTALS WERE DISCUSSED & SETTING UP A PRE-CON MEETING WITH INSPECTION/DEVELOPMENT SERVICE SERVICES TEAM TO ANSWER ANY FURTHER QUESTIONS THAT THE BUILDER MAY HAVE.
|
|
| 02/25/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | sand oil west 1.7-1.10 | 2/25/2026 4:22:25 AM
2/25/2026 4:22 AM UMC INC
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
2/25/2026 3:04:18 PM
Sand and oil drain up through 1.9 marked in blue P101
|
|
| 02/27/2026 | B:ELECTRICAL SERVICE | SHAWN VALENZUELA | PARTIAL | eTRAKiT Inspection Request | 1/7/2026 9:25:30 AM
1/7/2026 9:25 AM Clyde George
UFER inspection
Contact Name: Clyde George
Site Address: NOT ASSIGNED BRICKYARD BLDG 5
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
2/26/2026 2:39:55 PM
2/26/2026 2:39 PM Clyde George
Underground conduit on south side P1 electric room.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
2/27/2026 9:13:41 AM
Service conduits entering the building
South east side of the building
|
|
| 03/05/2026 | B:ELECTRICAL SERVICE | VINCE RAPONE | PARTIAL | eTRAKiT Inspection Request | 3/4/2026 11:01:30 AM
3/4/2026 11:01 AM Clyde George
Electrical underground conduit on north side P1 electric room.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
3/5/2026 12:36:32 PM
Under ground service for house panels good
|
|
| 03/11/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | eTRAKiT Inspection Request | 3/11/2026 4:56:36 AM
3/11/2026 4:56 AM UMC INC
1.7-1.9 west storm and sand oil piping
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/11/2026 12:16:41 PM
Storm Water and Sand oil drains through 1.9 as marked on P101.
|
|
| 03/12/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | East side Sand oil 1.9-1.16 | 3/12/2026 5:57:51 AM
3/12/2026 5:57 AM UMC INC
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/12/2026 2:11:39 PM
Small sections of DWV and storm water up to 1.9. Marked on plans.
|
|
| 03/13/2026 | B:ELECTRICAL UNDERGR | SHAWN VALENZUELA | PARTIAL | eTRAKiT Inspection Request | 3/12/2026 2:53:39 PM
3/12/2026 2:53 PM Clyde George
P1 electrical underground partial.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
3/13/2026 10:05:14 AM
Electrical underground partial approved
Underground conduit feeding commercial spaces / house panel equipment
3/13/2026 1:56:31 PM
Electrical underground partial approved
|
|
| 03/16/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | East sand oil line to tank tie in | 3/13/2026 3:37:11 PM
3/13/2026 3:37 PM UMC INC
Completes southeast sand oil piping to tank
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/16/2026 11:31:59 AM
Sand and Oil drain through 1.6 as marked in red on P-102.
|
|
| 03/16/2026 | B:ELECTRICAL SERVICE | VINCE RAPONE | PARTIAL | underground | 3/13/2026 1:58:25 PM
3/13/2026 1:58 PM Clyde George
Underground conduit from P1 electric room north.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
3/16/2026 1:33:09 PM
Underground
16 - 3" pvc panel feeds
1 - 1-1/2" elevator feed
|
|
| 03/17/2026 | PRE CON INSPECTION | BRETT LONGNECKER | APPROVED | | 3/17/2026 9:24:52 AM
Building pre-con conducted on March 17th, 2026 at 8:00 am in Rhyolite Conference Room.
|
|
| 03/23/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | eTRAKiT Inspection Request | 3/20/2026 5:50:17 PM
3/20/2026 5:50 PM UMC INC
west sand oil 1.9- 1.19
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/23/2026 11:39:15 AM
Sand and grease drain through 1.9
|
|
| 03/24/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | 1.9-1.19 west sanitary sewer | 3/24/2026 5:04:46 AM
3/24/2026 5:04 AM UMC INC
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/24/2026 3:05:35 PM
Drain through 1.19 marked in green on P102.
|
|
| 03/26/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | 1.10 sand oil stack, 1.9 storm stack | 3/25/2026 12:42:26 PM
3/25/2026 12:42 PM UMC INC
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/26/2026 10:04:00 AM
Small fill in for sand and grease and storm drain on P101 1 10, 1.9 approved ok to cover. Marked in red.
|
|
| 03/27/2026 | B:UNGRD PLUMB | MARTIN MAGERS | CANCEL | east sand oil 1.16-1.20 | 3/26/2026 2:20:58 PM
3/26/2026 2:20 PM UMC INC
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/27/2026 8:56:16 AM
Please do not schedule both AM and PM on the same day.
|
|
| 03/27/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | 8" san sewer cconnection to sand oil | 3/27/2026 5:03:18 AM
3/27/2026 5:03 AM UMC INC
this is seperate from the other inspection called in. If possible, need this in afternoon
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/27/2026 3:06:17 PM
Sand and Oil ground drain through just before 1.20 and waste ground drain sand oil separator tie in labeled on P-102 in green waste, and red Sand oil.
|
|
| 03/31/2026 | B:UNGRD PLUMB | BRETT LONGNECKER | PARTIAL | 8" SS from SOI to 1.20 | 3/30/2026 8:41:30 PM
3/30/2026 8:41 PM UMC INC
8" SS main with 4" and 6" risers for branches and cleanout
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
3/31/2026 1:15:09 PM
SOI 8 inch underground ok to cover as highlighted in yellow on P-102.
|
|
| 03/31/2026 | B:ELECTRICAL SERVICE | VINCE RAPONE | PARTIAL | eTRAKiT Inspection Request | 3/30/2026 3:05:49 PM
3/30/2026 3:05 PM Clyde George
Electrical undergrounds at P1 SOG 4.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
3/31/2026 2:03:34 PM
Electrical panel feed stub ups good
|
|
| 04/06/2026 | B:UNGRD PLUMB | BRETT LONGNECKER | PARTIAL | SS 1P/1.21-1.24 | 4/3/2026 1:17:12 PM
4/3/2026 1:17 PM UMC INC
8" san main with stub ups for branches
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
4/6/2026 3:35:55 PM
8 inch waste at gridlines 1P and 1.21 through 1.24 ok.
|
|
| 04/07/2026 | B:UNGRD PLUMB | BRETT LONGNECKER | PARTIAL | 6" san sew 1.22-1.27 | 4/7/2026 5:07:09 AM
4/7/2026 5:07 AM UMC INC
west side of P1
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
4/7/2026 3:20:12 PM
Underground plumbing ok as highlighted in blue on P-102 and P-103.
|
|
| 04/10/2026 | B:RGH ELECT | SHAWN VALENZUELA | PARTIAL | In slab electrical conduit/boxes. | 4/9/2026 1:39:46 PM
4/9/2026 1:39 PM Clyde George
Level 1 elevated deck, pour 1.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
4/10/2026 2:20:45 PM
Rough electrical partial approved
Elevated deck inspection for only part of 1st floor deck south end of deck. Verify supporting of pvc conduits. For lighting, power, carbon monoxide, and fire alarm.
Please call rough electrical inspection when the rest of elevated decking for level 1 is ready
|
|
| 04/10/2026 | B:UNGRD PLUMB | COLBY RIGGINS | PARTIAL | sanitary branches 1.20, 1.22 sand oil 1. | 4/9/2026 6:45:51 AM
4/9/2026 6:45 AM UMC INC
sanitary branches 1.20, 1.22
sand oil 1.20- 1.26
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 3037766659
e-Mail: RENEE.PENICK@UMC.US
4/10/2026 4:54:46 AM
4/10/2026 4:54 AM UMC INC
sand oil 1.20- 1.25
Sanitary branches 1.20, 1.22
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
4/10/2026 2:59:22 PM
sanitary branches 1.20, 1.22 ok
sand oil 1.20- 1.26 ok
4/10/2026 3:03:42 PM
sanitary branches 1.20, 1.22 ok
sand oil 1.20- 1.26 ok
|
|
| 04/13/2026 | B:ELECTRICAL SERVICE | VINCE RAPONE | PARTIAL | P1 SOG 4 | 4/10/2026 12:21:48 PM
4/10/2026 12:21 PM Clyde George
Underground conduit.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
4/13/2026 2:30:53 PM
Extending P1 pvc feed
2- 4"
|
|
| 04/14/2026 | B:UNGRD PLUMB | BRETT LONGNECKER | PARTIAL | Storm North Basement Parking | 4/13/2026 3:06:34 PM
4/13/2026 3:06 PM UMC INC
10" storm from H wall to 15'' past 1.25
6" storm at midwall 1.25 to 15'' past 1.25
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
4/14/2026 10:59:19 AM
Storm drain underground ok for basement parking north end as highlighted in yellow on P102 and P103.
|
|
| 04/23/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | L1 waste-1.2-1.6 | 4/22/2026 8:10:21 PM
4/22/2026 8:10 PM UMC INC
Main and future stub ups for TI spaces-tie in on P1 under ramp
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
4/23/2026 11:15:09 AM
DWV through 1.6 4 and 6 in pipe ok as marked in green on page P-101.
|
|
| 04/23/2026 | B:RGH ELECT | VINCE RAPONE | PARTIAL | L1 deck 2 | 4/22/2026 11:37:32 AM
4/22/2026 11:37 AM Clyde George
In-slab conduit/boxes at level 1 elevated deck pour 2.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
4/23/2026 1:45:48 PM
Level 1 decking pour 2 electrical rough good
Garage lights / FA
|
|
| 04/27/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | 8" san sewer | 4/24/2026 3:31:42 PM
4/24/2026 3:31 PM UMC INC
8" san sewer east side from 1.25 to out of building
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 3037766659
e-Mail: RENEE.PENICK@UMC.US
4/27/2026 1:55:45 PM
8" sanitary sewer up to 1.27 on P103
DWV through wall and up to main level at 1.65 on P 101.
|
|
| 04/28/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | L1 grease line | 4/27/2026 3:36:42 PM
4/27/2026 3:36 PM UMC INC
level 1 - 4" grease line- tie in P1 under ramp to north of 1.7 column-deep main only with stub ups for clean outs and branches
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 3037766659
e-Mail: RENEE.PENICK@UMC.US
4/28/2026 2:39:03 PM
Grease Waste through 1.7 shown in pink on P 101
|
|
| 04/29/2026 | B:UNGRD PLUMB | MARTIN MAGERS | CANCEL | 4" sand oil piping | 4/29/2026 5:08:11 AM
4/29/2026 5:08 AM UMC INC
sand oil main and branches 1.26 & 1.27
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
4/29/2026 2:53:43 PM
Canceled per call from Nate.
|
|
| 04/30/2026 | B:UNGRD PLUMB | MARTIN MAGERS | CANCEL | sand oil 1.26, 1.27 | 4/30/2026 4:24:30 AM
4/30/2026 4:24 AM UMC INC
sand oil between 1.26 & 1.27, stack and area drain stub up near stair core
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
4/30/2026 11:48:13 AM
Canceled per text from Nate.
|
|
| 05/01/2026 | B:UNGRD PLUMB | MARTIN MAGERS | PARTIAL | | 5/1/2026 2:36:51 PM
Grease waste 4" pipe from 1. 7 to 1.14. With 3 clean outs.
|
|
| 05/04/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | Sand oil stacks | 5/4/2026 5:06:40 AM
5/4/2026 5:06 AM UMC INC
sand oil running between 1.26, 1.27 stopping just west of 1L, running north with branch for area drain and stack at 1P/1.27-
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
5/4/2026 10:28:36 AM
Sand oil marked on P103 in pink approved.
|
|
| 05/05/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | CANCEL | L1 Deck 3 | 5/4/2026 11:19:24 AM
5/4/2026 11:19 AM Clyde George
In-deck electrical
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
5/5/2026 11:14:02 AM
Cancel per Clyde
|
|
| 05/05/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | north sanitary sewer connection | 5/5/2026 5:41:06 AM
5/5/2026 5:41 AM UMC INC
north sanitary connection to civil outside building
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 3037766659
e-Mail: RENEE.PENICK@UMC.US
5/5/2026 12:16:08 PM
Stub through and connection of 8" waste line. Anything outside of foundation will require a third party inspection as well.
|
|
| 05/08/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | L1 deck 3 | 5/7/2026 12:15:51 PM
5/7/2026 12:15 PM Clyde George
In slab electrical
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
5/8/2026 11:23:38 AM
Level 1 decking electrical rough good
Garage lights and FA
|
|
| 05/11/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | storm, sanitary P1 and L1 | 5/11/2026 6:09:04 AM
5/11/2026 6:09 AM UMC INC
Storm from 1.26 to 10", Sanitary from outside building to approx 1.29 with stub ups, 6" storm L1 at 1.7
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 3037766659
e-Mail: RENEE.PENICK@UMC.US
5/11/2026 12:10:48 PM
Storm water as marked in yellow on P103 at grid line 1.27
Sewer line marked in purple on P 103 on grid line 1.30
Storm Water line through wall and stubbed up. Marked on purple on P 101 grid line 1.7
|
|
| 05/13/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | 12" storm with cleanouts and branches | 5/8/2026 2:47:01 PM
5/8/2026 2:47 PM UMC INC
1.26 piped east along 1.27 columns- to 10" running north
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
5/13/2026 4:34:30 AM
5/13/2026 4:34 AM UMC INC
12" storm from stair core to outside building-2 cleanouts, 1 10" branch
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
5/13/2026 2:44:20 PM
Storm water 12" stub out on north side.
|
|
| 05/14/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | sanitary near midwall,west along 1.28 | 5/14/2026 6:10:01 AM
5/14/2026 6:10 AM UMC INC
sanitary from 1.26 north along midwall, east along 1.28
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
5/14/2026 2:24:59 PM
Sami ray wast 1.27 rgiugh 1.28 marked on plans in purple. see pictures.
5/14/2026 2:29:31 PM
Sanitary waste 1.27 through 1.28 marked on plans in purple. see pictures.
|
|
| 05/15/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | 6" sanitary | 5/15/2026 6:16:49 AM
5/15/2026 6:16 AM UMC INC
6" sanitary from 1.30 north near stair core under conduit
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
5/15/2026 12:10:49 PM
6" Sanitay from 1.31 to1.27. Marked in green on P 103.
|
|
| 05/19/2026 | B:RE ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | P1 SOG 5 electrical conduit underground. | 5/18/2026 2:47:50 PM
5/18/2026 2:47 PM Clyde George
P1 SOG 5 underground.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
5/19/2026 12:57:00 PM
Under slab for mdp
29 - 3" pvc pipes
2 - 2" pvc pipes
|
|
| 05/20/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | L1 deck 4 | 5/19/2026 12:55:33 PM
5/19/2026 12:55 PM Clyde George
In slab roughs.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
5/20/2026 1:53:51 PM
L1 decking pour 4 approved
Lights and FA
|
|
| 05/22/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | Level 1 leasing bathrooms | 5/22/2026 4:53:01 AM
5/22/2026 4:53 AM UMC INC
level 1 near 1.9, 1F area- amenity bathrooms with mop sink and 2" branches for drinking founntian and DWB capped for future
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 3037766659
e-Mail: RENEE.PENICK@UMC.US
5/22/2026 2:54:03 PM
DWV under ground for Bath area and mop sink in the amenities area approved as highlighted in green. Near 1.9, F
|
|
| 05/27/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | 10" storm, 8" sanitary, 6" sanitary | 5/27/2026 4:56:07 AM
5/27/2026 4:56 AM UMC INC
10" storm near north elevator, 8" sanitary near elevator, 6" sanitary at stair core south to 1.26
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
5/27/2026 12:44:27 PM
Sanitary 1.26 to 1.28 east side marked in green, Storm 1.28 near elevator marked in yellow Sewer in the same area marked in purple on P -103.
|
|
| 05/29/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | 6" san, 8" storm, 6" sanitary | 5/29/2026 4:53:59 AM
5/29/2026 4:53 AM UMC INC
6" sanitary branch at northwest corner at midwall, 8" storm branch to midwall 1.28, 6" sanitary branch at 1.30
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 3037766659
e-Mail: RENEE.PENICK@UMC.US
5/29/2026 1:10:33 PM
6%34 sanitary branch at northwest corner at midwall, marked in purple 8%34 storm branch to midwall 1.28, 6%34 marked in yellow. sanitary branch at 1.30 marked in purple.see page P-103
|
|
| 06/01/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | Dogwash and bike storage | 6/1/2026 4:34:19 AM
6/1/2026 4:34 AM UMC INC
4" floor drain & 3" floor sink in dog wash, 4" floor drain in bike storage
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/1/2026 12:44:55 PM
4%34 floor drain & 3%34 floor sink in dog wash, 4%34 floor drain in bike storage, approved for under ground plumbing. See P-103 marked in yellow.
|
|
| 06/02/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | Sand oil 1.27 north | 6/2/2026 6:03:41 AM
6/2/2026 6:03 AM UMC INC
4" sand oil from 1.27 north, picking up area drain just north of 1.27 @1N grid, north to soi in trash room
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/2/2026 9:45:14 AM
4%34 sand oil from 1.27 north, picking up area drain just north of 1.27 @1N grid, north to soi in trash room, approved.
|
|
| 06/03/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | sand oil stacks and final 6 area drains | 6/3/2026 6:01:08 AM
6/3/2026 6:01 AM UMC INC
North ramp area drains, and all other drains and stacks in p103.
Sanitary- janitor colset mop sink, vent and 4" stack
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/3/2026 11:54:31 AM
North ramp area drains, and all other drains and stacks in p103.
|
|
| 06/05/2026 | B:GROUND PLUMBING | COLBY RIGGINS | PARTIAL | L1- 4" grease | 6/4/2026 4:57:21 PM
6/4/2026 4:57 PM UMC INC
4” grease waste with future stub ups and cleanouts 1.13-1.22
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/5/2026 10:26:26 AM
L1- 4" grease, two cleanouts two future stub ups, p102 highlighted in pink.
|
|
| 06/09/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | L1 fitness washer and sanitary | 6/9/2026 4:19:09 AM
6/9/2026 4:19 AM UMC INC
2" washer drain for fitness center near leasing office
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/9/2026 6:01:02 AM
6/9/2026 6:01 AM UMC INC
2” washer drain 1.13/1F
4”&6” sanitary @ 1.19-1.21 /1H level 1
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/9/2026 2:48:08 PM
4 and 6 in sanitary drains and washer box 2" drain as marked in green on P-102, approved.
|
|
| 06/11/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | level 2 deck pour 1 | 6/10/2026 7:48:36 AM
6/10/2026 7:48 AM Jaden Chismar
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
6/11/2026 12:22:34 PM
Deck pour 1 level 2 approved
1st floor - Lighting / FA
2nd floor - kit island pipes
|
|
| 06/12/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | 6" storm | 6/11/2026 3:34:52 PM
6/11/2026 3:34 PM UMC INC
Level 1 -6” storm 1.21 north to 1.25 through wall to P1
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/12/2026 8:40:17 AM
Level 1 -6" storm 1.21 north to 1.25 through wall to P1
|
|
| 06/18/2026 | B:ELECTRICAL TEMPORARY CONSTRUCTION METER | VINCE RAPONE | APPROVED | Temp power meter release inspection | 6/17/2026 10:07:15 AM
6/17/2026 10:07 AM Luke Hinder
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
6/18/2026 12:11:25 PM
Temp construction meter approved
Okay to release meter
|
|
| 06/24/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | Level 2 Deck Pour 2 | 6/23/2026 12:36:07 PM
6/23/2026 12:36 PM Luke Hinder
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
6/24/2026 2:39:39 PM
Level 2 pour 2 electrical rough approved
Garage lighting / FA
|
|
| 06/24/2026 | B:ROUGH PLUMBING | MARTIN MAGERS | PARTIAL | Area drains | 6/24/2026 6:15:42 AM
6/24/2026 6:15 AM UMC INC
Level 1 area drains- piping in P1
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/24/2026 2:43:33 PM
Sand Oil drains from level 1. Marked in purple on P101 and P102.
|
|
| 06/26/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | Level 1 sanitary- | 6/26/2026 4:19:03 AM
6/26/2026 4:19 AM UMC INC
Sanitary sewer 1.28 - 1.30
3-4” stacks, 1- 6” stack with 6” penetrating midwall into P1 garage
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
6/29/2026 8:27:36 AM
3-4" stacks, 1- 6" stack with 6" penetrating midwall into P1 garage approved.
All Groung plumbing is complete as marked on plans, please revise plans to as build and recall ground plumbing.
|
|
| 07/01/2026 | B:RE ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | Level 2 Deck pour 3, pool deck rough in | 6/30/2026 1:25:29 PM
6/30/2026 1:25 PM Luke Hinder
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
7/1/2026 1:41:16 PM
Level 2 pour 3 approved
Niche lights
Planter j boxes
Bbq grills
|
|
| 07/08/2026 | B:ROUGH ELECTRICAL | SHAWN VALENZUELA | PARTIAL | Level 2 Deck Pour 4 | 7/7/2026 12:34:23 PM
7/7/2026 12:34 PM Luke Hinder
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
7/8/2026 1:29:21 PM
Rough electrical partial approved
Level 2 deck pour 4
Parking lights/ fire alarm co and power in parking garage
Kitchen island power on 2nd floor for units
|
|
| 07/10/2026 | B:ROUGH ELECTRICAL | SHAWN VALENZUELA | PARTIAL | Level 1 Pour 5 Deck Inspection | 7/9/2026 7:02:12 AM
7/9/2026 7:02 AM Joel Van Valkenburgh
Contact Name: Joel Van Valkenburgh
Site Address: 444 FIFER ST
Phone: 3039611229
e-Mail: joelv@1stelectric.net
7/10/2026 8:20:59 AM
Rough electrical inspection partial approved
Notes
Level 1 pour 5
Lights, power, CO, car charger conduit
Noted on prints what area was looked at and noted what area was look at on 7/8/26
|
|
| 07/15/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | eTRAKiT Inspection Request | 7/14/2026 9:05:54 AM
7/14/2026 9:05 AM Joel Van Valkenburgh
2nd Floor Pour 5 Deck Rough
Contact Name: Joel Van Valkenburgh
Site Address: 444 FIFER ST
Phone: 3039611229
e-Mail: joelv@1stelectric.net
7/15/2026 12:54:31 PM
2nd level pour 5 approved
Clubhouse 2 - floor boxes / panel C
Planter stubs
|
|
| 07/20/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | eTRAKiT Inspection Request | 7/17/2026 9:01:11 AM
7/17/2026 9:01 AM Joel Van Valkenburgh
Level 1 Pour 6 Rough Deck Inspection
Contact Name: Joel Van Valkenburgh
Site Address: 444 FIFER ST
Phone: 3039611229
e-Mail: joelv@1stelectric.net
7/20/2026 11:32:38 AM
Level 1 pour 6 approved
Dog wash / bike resident storage
|
|
| 07/23/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | eTRAKiT Inspection Request | 7/22/2026 7:07:33 AM
7/22/2026 7:07 AM Joel Van Valkenburgh
Level 2 Pour 6 Rough Electrical
Contact Name: Joel Van Valkenburgh
Site Address: 444 FIFER ST
Phone: 3039611229
e-Mail: joelv@1stelectric.net
7/23/2026 2:11:28 PM
Level 2 deck pour 6 approved
|
|
| 07/24/2026 | B:GROUND PLUMBING | MARTIN MAGERS | PARTIAL | Added underground RFI-115 | 7/24/2026 3:44:10 AM
7/24/2026 3:44 AM UMC INC
2 bathroom groups, mop sink, kitchen and extra lav, and 4" future-
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
7/24/2026 10:14:35 AM
2 bathroom groups, mop sink, kitchen and extra lav, and 4%34 future-
Please submit revision for all of this plumbing.
|
|
| 07/30/2026 | B:RE ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | Level 2 Pour 7 Deck work | 7/29/2026 1:03:45 PM
7/29/2026 1:03 PM Luke Hinder
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
7/30/2026 2:17:49 PM
Level 2 pour 7 okay
|
|
| 08/10/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | deck pour 7 level 2 | 8/7/2026 9:06:45 AM
8/7/2026 9:06 AM Joel Van Valkenburgh
Level 2 Pour 8 Deck Rough
Call Luke (303) 961-0137
Contact Name: Joel Van Valkenburgh
Site Address: 444 FIFER ST
Phone: 3039611229
e-Mail: joelv@1stelectric.net
8/10/2026 1:30:49 PM
Level 2 deck pour 7 approved
Garage lighting and FA
Planters for court yard
|
|
| 08/14/2026 | B:RE ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | Level 2 pour 9 Deck Rough in | 8/13/2026 2:39:21 PM
8/13/2026 2:39 PM Luke Hinder
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
8/14/2026 11:33:52 AM
Level 2 deck pour 9
2 - kitchen islands
Garage light
|
|
| 08/18/2026 | B:ROUGH PLUMBING | MARTIN MAGERS | PARTIAL | Courtesy Inspection | 8/18/2026 6:07:03 AM
8/18/2026 6:07 AM UMC INC
Questions about sleeving, and castle rock standards for boring studs and top plates
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
8/18/2026 12:40:38 PM
Consult only. Answered questions
1. Penetrations in a post tension floor will require structural engineering.
2. Penetrations in wood framing top plates and studs are outlined in the plans on S-702. Situations outside of these would require structural engineering.
|
|
| 08/21/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | Level 2 Deck pour 10. | 8/20/2026 1:37:55 PM
8/20/2026 1:37 PM Luke Hinder
Last Deck pour
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
8/21/2026 1:47:52 PM
Level 2 deck pour 10 app
3 - kit islands
Row of garage lights
Electrical sleeves for electrical room
|
|
| 08/25/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | Underground Secondaries | 8/24/2026 10:27:53 AM
8/24/2026 10:27 AM Luke Hinder
MSB-N, CMC, and Fire Pump underground.
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
8/25/2026 2:03:07 PM
East side
1 - 3" pvc for fire pump stubbed in CMC transformer
CMC to transformer - 7 - 3" pvc
MSBS to transformer - 13 - 3" pvc
MSB to transformer 13 - 3" pvc
Please update and revise print with fire pump on the electrical one line
|
|
| 08/27/2026 | B:ELECTRICAL UNDERGR | VINCE RAPONE | PARTIAL | Underground MSB & MSB-N | 8/26/2026 2:40:52 PM
8/26/2026 2:40 PM Luke Hinder
Secondaries
Contact Name: Luke Hinder
Site Address: 444 FIFER ST
Phone: 3039610137
e-Mail: lukeh@1stelectric.net
8/27/2026 2:10:19 PM
Underground secondary's
MSB to transformer continued - 13 conduits
MSB-N to transformer stubbed to building
|
|
| 09/14/2026 | B:PREROCK | JOE CARBAUGH | NOT APPROVED | eTRAKiT Inspection Request | 9/11/2026 2:25:53 PM
9/11/2026 2:25 PM CONFLUENCE BUILDERS LLC
I would like to inspect the first layer of pre-rock on our LVL beams that sit in our floor/ceiling assembly in phase 1 area B
Contact Name: CONFLUENCE BUILDERS LLC
Site Address: 444 FIFER ST
Phone: 7202129237
e-Mail: Jaden@confluenceco.com
9/14/2026 3:29:45 PM
NOT APPROVED-
1) FIRST LAYER OF 5/8" TYPE X GYP ON WOOD BEAM - OK PER DETAIL PS-3/ 1 TYP. WOOD BEAM ? PRIMARY STRUCTURE PROTECTION.
ROOMS
NOTE: LOOKING FOR CLARIFICATION ON THE PROTECTIONS OF THE BEAMS BEARING POINT AT BOTH ENDS.
OK TWO ROCK SECOND LAYER.
|
|
| 09/15/2026 | B:PREROCK | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 9/14/2026 3:19:21 PM
9/14/2026 3:19 PM Jaden Chismar
I want to inspect the 2nd layer of drywall on our LVL beams that sit in our floor ceiling assembly in area A and B
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
9/15/2026 10:20:53 AM
PARTIAL-
1) SECOND LAYER OF 5/8" TYPE X GYP FOR LVL BEAM 1 HR. RATING - / ROOMS 286;& 258 - OK.
NOTE : UPLOAD STAMPED DETAIL & STAMPED LETTER FROM ARCHITECTURAL & STRUCTURAL ENGINEER.
|
|
| 09/25/2026 | B:ROUGH PLUMBING | MARTIN MAGERS | PARTIAL | Courtesy Inspection | 9/24/2026 11:07:33 AM
9/24/2026 11:07 AM UMC INC
Question about main water service in building
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
9/25/2026 3:40:03 PM
Consult only on proposed variant to water tree design. Referred to Greg Swaney at the water dept.
|
|
| 09/28/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 9/25/2026 3:23:19 PM
9/25/2026 3:23 PM Jaden Chismar
I would like to inspect exterior sheathing on level 2/3 on Phase 1
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
9/28/2026 1:35:40 PM
1) ZIP SYSTEM 2ND FLOOR EXTERIOR SHEAR FOR PHASE ONE- SEE ATTACHMENT HIGHLIGHTED IN RED. In inspection notes under building 5 file.
|
|
| 09/28/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 9/25/2026 3:22:21 PM
9/25/2026 3:22 PM Jaden Chismar
I would like to inspect our CFMF on the exterior of the builidng on the south/east corner of the building,Grid lines 1.5-1L
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
9/28/2026 10:47:43 AM
PARTIAL- EXTERIOR CFMF RGH FRAME P1 LEVEL S/E CORNER
1) MISSING CORRECT NUMBER OF RAMSET ATTACHMENT TO SLIP TOP TRACK 6" O.C. AS REQUIRED PER PLAN / S/E CORNER.
2) REST OF S/E CORNER P1 LEVEL 1 & 2 - OK.
|
|
| 09/30/2026 | B:ROUGH ELECTRICAL | VINCE RAPONE | PARTIAL | Consult | 9/28/2026 3:10:35 PM
9/28/2026 3:10 PM Clyde George
Would like to discuss step lights at L2 patios.
Contact Name: Clyde George
Site Address: 444 FIFER ST
Phone: 3034088187
e-Mail: cgeorge@confluenceco.com
9/30/2026 7:04:24 AM
Wanting to remove patio lights L2 and above
Myself or Jon will reach out to Clyde
|
|
| 10/06/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/5/2026 2:39:18 PM
10/5/2026 2:39 PM Jaden Chismar
I would like to inspect the CFMF on the South side of the building.
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/6/2026 10:08:28 AM
PARTIAL-
1) FIRST FLOOR CFMF AT S/W CORNER- OK / SEE ATTACHMENT PICTURE IN INSPECTORS PHOTO FILE.
|
|
| 10/07/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/6/2026 2:05:05 PM
10/6/2026 2:05 PM Jaden Chismar
I would like to inspect the concealed hanger connection at our window headers on level 2 of area A.
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/7/2026 11:14:34 AM
PARTIAL-
1) HUCQ612 CONCEALED HANGERS AT WINDOW HEADERS IN ROOMS 264, 266, 267, 269, 270, 277 AND 274 - OK.
|
|
| 10/09/2026 | B:DRYWALL SHEAR WALL | JOE CARBAUGH | CANCEL | eTRAKiT Inspection Request | 10/8/2026 3:57:18 PM
10/8/2026 3:57 PM Jaden Chismar
I would like to get a screw inspection for our exterior dens glass on level 1 East/South and West elevations
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/9/2026 3:13:51 PM
CANCELED-
1) DUPLICATE INSPECTION .
|
|
| 10/09/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | NOT APPROVED | eTRAKiT Inspection Request | 10/8/2026 3:55:54 PM
10/8/2026 3:55 PM Jaden Chismar
I would like to inspect level 3 sheathing and level 2 corrections on Phase 1
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/9/2026 3:13:53 PM
NOT APPROVED-
EXTERIOR SHEAR 3RD FLOOR
1) CORRECTIONS NEEDED- (FEILD) NAILING / TYPICAL NAILING AT WINDOWSILLS THROUGH OUT /CONFIRMED BUT JOINT TOLERANCES WITH ZIP SYSTEM.
NOTE: RECALL INSPECTION WHEN CORRECTIONS HAVE BEEN MADE.
|
|
| 10/13/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | MARTIN MAGERS | PARTIAL | eTRAKiT Inspection Request | 10/12/2026 3:48:48 PM
10/12/2026 3:48 PM Jaden Chismar
I would like to inspect exterior gyp on level 1 on the south/east/west
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/13/2026 12:05:52 PM
All gypsum sheathing south of 1.5 complete and approved. Highlighted in red on A131.
|
|
| 10/16/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | CANCEL | eTRAKiT Inspection Request | 10/15/2026 1:51:26 PM
10/15/2026 1:51 PM Jaden Chismar
I would like to inspect Level 2 sheathing patches, Level 3 Sheathing corrections and Level 4 Sheathing of phase 1
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/16/2026 8:55:45 AM
CANCELED-
NOTE: CONTRACTOR TRIED COUNSELING INSPECTION THE EVEN BEFORE INSPECTION.
|
|
| 10/16/2026 | B:RE ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/15/2026 1:50:10 PM
10/15/2026 1:50 PM Jaden Chismar
I would like to inspect CFMF on the West side of the building. from grid line 1.5-1.17
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/16/2026 8:55:47 AM
PARTIAL-
1) CONCEALED HANGERS HU612 IN 371,376, 369,374 & 361 - OK.
|
|
| 10/21/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/20/2026 1:20:21 PM
10/20/2026 1:20 PM Jaden Chismar
CFMF on the west side of the building
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/21/2026 12:36:14 PM
PARTIAL-
1) CFMF ON WEST SIDE OF PHASE ONE FIRST FLOOR- OK.
|
|
| 10/22/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/21/2026 3:20:54 PM
10/21/2026 3:20 PM Jaden Chismar
I would like to inspect level 3 area A zip sheathing
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/22/2026 1:55:10 PM
PARTIAL-
1) 3rd FLOOR FIRST PHASE EXTERIOR SHEAR CORRECTIONS ONLY- OK.
|
|
| 10/22/2026 | B:ROUGH MECHANICAL | BRETT LONGNECKER | NOT APPROVED | Unit Rough Consult | 10/21/2026 3:21:54 PM
10/21/2026 3:21 PM Jaden Chismar
I would like to call a courtesy inspection for unit mechanical
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/22/2026 2:28:38 PM
Rough Mech consult for unit ceiling damper fire assemblies and install only.
Dryer duct length and elbows to be labeled at rough mech inspections.
|
|
| 10/26/2026 | B:RE ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/23/2026 3:26:27 PM
10/23/2026 3:26 PM Jaden Chismar
I would like to inspect level 4 area A concealed hangers at headers
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/26/2026 11:16:30 AM
PARTIAL-
1) MODIFIED FRAMING FOR CONCEALED HANGER AND HEADER HEIGHT OK PER RFI IN UNIT 480.
|
|
| 10/28/2026 | B:ROUGH FRAME | JOE CARBAUGH | NOT APPROVED | eTRAKiT Inspection Request | 10/27/2026 3:15:10 PM
10/27/2026 3:15 PM Jaden Chismar
I would like to inspect our temp plateform in the elevator shaft
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/29/2026 6:56:00 AM
NOT APPROVED-
TEMP PLATFORM FOR STAIR 2-
1) GUARDS NEED TO MEETING CODE FOR TEMP FALL PROTECTION FOR TEMPORARY SHAFT PLATE FORM . CURRENT GUARD IN (FRONT) OF ELEVATOR SHAFT - OK.
2) RE- SCHEDULE ONE ITEM HAS BEEN CORRECTED.
|
|
| 10/28/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/27/2026 3:15:50 PM
10/27/2026 3:15 PM Jaden Chismar
I would like to inspect the CFMF sheathing on the west side of the building
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/29/2026 6:56:03 AM
PARTIAL-
1) EXTERIOR SHEAR FOR FIRST FLOOR WEST / GRID LINES 1.5 to 1.7, & 1.8 to 1.14- OK.
|
|
| 10/28/2026 | B:PREROCK | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/27/2026 3:14:17 PM
10/27/2026 3:14 PM Jaden Chismar
I would like to inspect the pre-rock on level 5 for roof truss installation
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/29/2026 6:56:05 AM
PARTIAL-
1) HEAD OF WALL FRAMING VERIFIED IN AREA 1C LEVEL FIVE - OK.
2) 5/8" TYPE X (AMERICAN) GYP AT HEAD OF WALL FRAMING VERIFIED PER U305 - OK, LEVEL 5 AREA 1C.
|
|
| 10/29/2026 | B:DRYWALL | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/28/2026 3:46:45 PM
10/28/2026 3:46 PM Jaden Chismar
Level 5 1C 2nd layer pre-rock for roof truss installation
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/29/2026 2:32:49 PM
PARTIAL-
1) EXP 5/8 TYPE X AT (HEAD OF WALL) IN AREA'S HIGHLIGHTED IN RED SEE PICTURE IN INSPECTION PHOTOS, LEVEL FIVE/ PAGE ? 105 OF NATIONAL STATES GYP & AMERICAN GYP CAN BE USED PER U305- OK.
NOTE: SECOND LAYER OF GYP IS FOR SOUND (ONLY) NOT PART OF U305 LISTENING.
|
|
| 10/30/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/29/2026 3:17:46 PM
10/29/2026 3:17 PM Jaden Chismar
I would like to inspect Level 4 Area A exterior sheathing
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/30/2026 11:29:35 AM
PARTIAL-
1) EXTERIOR ZIP SHEAR FOR LEVEL FOUR HIGHLIGHTED RED ON PLANS, SEE INSPECTOR PHOTO FILE FOR DETAIL.
|
|
| 10/30/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 10/29/2026 3:15:50 PM
10/29/2026 3:15 PM Jaden Chismar
I would like to inspect Head of wall at level 5 for our pre-rock activaties
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
10/30/2026 11:29:37 AM
PARTIAL-
1) HEAD OF WALL FRAMING AT 4TH FLOOR (HIGHLIGHTED) AREAS ONLY IN AREA 1 A & 1 B. - OK.
|
|
| 11/03/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/2/2026 5:05:50 PM
11/2/2026 5:05 PM Jaden Chismar
I would like to inspect our temp elevator platform in stair 2
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/3/2026 1:48:05 PM
PARTIAL-
1) SHAFT TWO LEVEL FIVE TEMPORARY PLATFORM- OK PER OSHA REQUIREMENTS.
|
|
| 11/03/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/2/2026 5:04:18 PM
11/2/2026 5:04 PM Jaden Chismar
I would like to inspect level 5 sheathing
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/3/2026 1:48:08 PM
PARTIAL-
1) FIFTH FLOOR EXTERIOR SHEAR AREA MARKED IN RED ONLY DIGITALLY ON PLANS - OK. SEE PICTURE IN INSPECTOR PHOTOS UNDER BUILDING 5.
|
|
| 11/05/2026 | B:DRYWALL | JOE CARBAUGH | NOT APPROVED | eTRAKiT Inspection Request | 11/4/2026 2:58:57 PM
11/4/2026 2:58 PM Jaden Chismar
I would like to call a courtesy inspection for our shafts in Phase 1 area A
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/5/2026 11:58:49 AM
NOT APPROVED.
1) THIS WAS A COURTESY INSPECTION TO DISCUSS INSPECTION PROCESS FOR DRYWALL INSPECTION AT SHAFT ASSEMBLIES & CONSTRUCTIBILITY FOR TOP OF SHAFT/ DOG FRAMING FOR THE SHAFTS.
NOTE: ANY CHANGES TO RATED ASSEMBLY WILL NEED TO BE DESIGNED , STAMPED & SUBMITTED TO THE TOWN.
|
|
| 11/06/2026 | B:PREROCK | MARTIN MAGERS | PARTIAL | eTRAKiT Inspection Request | 11/5/2026 3:37:11 PM
11/5/2026 3:37 PM Jaden Chismar
I would like to inspect the framing behind the pre-rock areas
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/6/2026 2:26:03 PM
This is a framing inspection for the areas to be pre rocked. Area A on 5th floor approved.
|
|
| 11/09/2026 | B:PREROCK | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/6/2026 12:22:24 PM
11/6/2026 12:22 PM Jaden Chismar
I would like to inspect the Pre-rock areas in level 2 and level 3
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/9/2026 10:36:12 AM
PARTIAL-
1) PRE ROCK INSPECTIONS FOR CONCEALED SPACES IN AREA (A) AS HIGHLIGHTED ON DIGITAL PLANS & IN INSPECTION PHOTOS FILE. - OK.
|
|
| 11/10/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/9/2026 10:44:05 AM
11/9/2026 10:44 AM Jaden Chismar
I would like to inspect the roof sheathing and the roof couch framing
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/10/2026 9:30:02 AM
PARTIAL-
1) ALL OF PHASE 1 ROOF DECKING, NAILING, CLIPS - OK.
2) RGH FRAME ON ROOF COUCHES ( WALLS ONLY) - OK. FLOOR FRAMING FOR ROOF COUCHES TO BE INSPECTED AT FUTURE INSPECTION.
3) FRT SHEATHING MEETS CODE REQUIREMENT OF MINIMUM 4' FROM RATED ASSEMBLY- OK.
NOTE: REMINDER OF NO ROOF PENETRATIONS WITH IN A MINIMUM OF 4' OF FIREWALL.
FLOOR FRAMING FOR ROOF COUCHES TO BE INSPECTED AT FUTURE INSPECTION.
|
|
| B:BUILDING SEPERATION WALL | BRETT LONGNECKER | | eTRAKiT Inspection Request | 10/27/2026 3:13:10 PM
10/27/2026 3:13 PM Jaden Chismar
I would like to inspect the CFMF Sheathing screw on the west side of the building
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/12/2026 3:18:57 PM
11/12/2026 3:18 PM Jaden Chismar
I would like to inspect the level 2-5 corridors for joist framing
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
|
|
| 11/13/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/12/2026 3:20:13 PM
11/12/2026 3:20 PM Jaden Chismar
I would like to call in the corridor joist framing for levels 2-5
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/13/2026 11:20:27 AM
PARTIAL-
1) RGH FRAME CORRIDOR, CEILING FRAMING (ONLY) LEVELS 3 & 2 - OK.
NOTE: NEED CLARIFICATION ON CONCEALED SPACE BETWEEN STAIR 2 CMU UNIT 2.1.1 & UNIT 0.1 ON 3rd FLOOR.
|
|
| 11/13/2026 | B:PREROCK | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/12/2026 3:20:58 PM
11/12/2026 3:20 PM Jaden Chismar
I would like to inspect levels 2-5 concealed spaces for pre-rock
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/13/2026 11:20:29 AM
PARTIAL-
1) RGH FRAME / PRE-ROCK IN CONCEALED SPACES FOR WALL FRAMING ON LEVEL 5 MISSING H2.5T AT HEAD OF WALL AT R255 ROOF TRUSS IN CONCEALED SPACE. REST OF LEVEL 5 AREA B - OK.
2) RGH FRAME / PRE-ROCK IN CONCEALED SPACES FOR WALL FRAMING ON LEVELS 4,,3 & 2 AREA B - OK.
|
|
| 11/13/2026 | B:ROUGH PLUMBING | MARTIN MAGERS | PARTIAL | Area drain piping 1.27 and 1.26 | 11/12/2026 10:01:43 AM
11/12/2026 10:01 AM UMC INC
L1 area drains piped to stacks on P!
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
11/13/2026 4:25:07 PM
P 103 1.26 and 1.27 floor drain said and oil x 5, one not on test
|
|
| 11/17/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/16/2026 3:34:11 PM
11/16/2026 3:34 PM Jaden Chismar
I would like to inspect my CFMF from gridline 1.17-1.32
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/17/2026 11:08:51 AM
PARTIAL-
1) CFMF ON 1ST FLOOR WEST FROM GRID LINE 117 THROUGH GRIDE 2.47 - OK.
2) SECOND FLOOR CONCEALED HEADER HANGERS - OK SOUTHWEST UNITS.
NOTE: SPOKE WITH JADEN ASST SUPERINTENDENT ABOUT THE U357 FIRE SEPARATION WALL BETWEEN PHASE 1 & 2 ABOUT THE HORIZONTAL AIR GAPS BETWEEN SEEMS OF ASSEMBLY & AND LOOKING FOR CLARIFICATION FROM COLORADO DESIGN PROFESSIONAL IS AS BUILT IS OK OR H CHANNEL IS REQUIRED.
|
|
| 11/18/2026 | B:EXTERIOR AND INTERIOR SHEAR AND SHEATHING | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/17/2026 4:36:59 PM
11/17/2026 4:36 PM Jaden Chismar
I would like to inspect the zip sheathing on the exterior for levels 4/5 in areas B and C
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/18/2026 3:25:08 PM
PARTIAL-
1) 5TH & 4th FLOOR EXTERIOR SHEAR ZIP SYSTEM FOR AREA'S B & C - OK.
|
|
| 11/18/2026 | B:DRYWALL | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/17/2026 4:36:10 PM
11/17/2026 4:36 PM Jaden Chismar
I would like to inspect the screws for the pre-rock areas on level 3-5
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/18/2026 3:25:10 PM
PARTIAL-
1) DRYWALL FOR CONCEALED SPACES AND TUBS OK AS HIGHLIGHTED ON PLANS FOR LEVEL 5 AND 4 ARE A. SEE PICS AND INSPECTION PHOTO FILE.
|
|
| 11/19/2026 | B:PRE_ROCK | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/18/2026 5:27:27 PM
11/18/2026 5:27 PM Jaden Chismar
I would like to inspect level 2/3 drywall screw in concealed spaces and tub/showers
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/19/2026 12:46:30 PM
PARTIAL-
1) FRAME INSPECTION FOR CONCEALED SPACES & TUBS AS MARKED ON DITAL PLANS.
|
|
| 11/19/2026 | B:ROUGH FRAME | JOE CARBAUGH | PARTIAL | eTRAKiT Inspection Request | 11/18/2026 5:26:02 PM
11/18/2026 5:26 PM Jaden Chismar
I would like to inspect concealed hangers on level 3 headers in are ma B/C
Contact Name: Jaden Chismar
Site Address: 444 FIFER ST
Phone: 9706726538
e-Mail: Jaden@confluenceco.com
11/19/2026 12:46:32 PM
PARTIAL-
1) CONCEALED HANGERS AT HEADERS OF WINDOW OPENINGS AS HIGHLIGHTED ON DITAL PLANS FOR ( PARTIAL) LEVEL OF 2 & 3 AREA B & C - OK.
|
|
| B:ROUGH ELECTRICAL | VINCE RAPONE | | eTRAKiT Inspection Request | 11/20/2026 3:00:42 PM
11/20/2026 3:00 PM Joel Van Valkenburgh
Phase 1 Section A Couch Inspection
Contact Name: Joel Van Valkenburgh
Site Address: 444 FIFER ST
Phone: 3039611229
e-Mail: joelv@1stelectric.net
|
|
| 11/20/2026 | B:ROUGH PLUMBING | MARTIN MAGERS | PARTIAL | Partial main gas | 11/19/2026 3:15:36 PM
11/19/2026 3:15 PM UMC INC
Gas piping from meter into building- pool deck, 3”, 4”, 1-1/2” with risers to 5th floor and temporary stub outs on risers for temp heat L2,L3,L4
Contact Name: UMC INC
Site Address: 444 FIFER ST
Phone: 7204034162
e-Mail: RENEE.PENICK@UMC.US
11/20/2026 3:10:01 PM
Main trunk line from meter to 1.23 , 2 1 1/2 in and 1 3" brach lines gas lines vertical up through the floor of the 5th floor.
Ok to release meter for temp heat on these lines.
|
|